Phase 0 · Independent validation in progress

Clean electromagnetic power, proven in the open.

EtherTap is developing a coil-based electromagnetic energy converter. Before we ask anyone to buy, partner or invest, we are putting the design through calibrated, independent, closed-loop testing, and we will publish what we find.

5-coilfirst bench prototype
3 gatesbefore funding stages release
100%of results to be documented
COIL 1COIL 2COIL 3COIL 4COIL 5
Illustrative schematic, not a measured result. Final topology is under validation.
Vision & mission

Energy that is local, quiet and independent.

We want households, farms and small businesses to generate more of their own power with equipment that has no fuel line and few moving parts, and we hold ourselves to a simple rule: nothing is claimed until it is measured.

◎

Vision

A world where compact, dependable electromagnetic converters sit alongside solar and storage as everyday sources of local power.

⚙

Mission

Turn a promising bench prototype into a validated, certifiable product, with every claim backed by calibrated data that others can check.

✓

Principles

Evidence before marketing. Independent testing before funding. Open reporting of results, including the unwelcome ones.

The technology

A coil array, a magnetic field and a tight air gap.

The EtherTap prototype arranges electromagnetic coils around a magnetic structure with a small air gap (4 mm in the first build). The aim is to convert electrical input into usable DC output as efficiently as possible, and to find out how far efficiency can be pushed.

Like every energy converter, it is bound by conservation of energy. Our research question is practical: how efficient can this architecture get, and does it offer cost, size or reliability advantages over existing options?

FIRST PROTOTYPE · MAY 2021

Bench build, as recorded

  • ▸ 5 coils
  • ▸ 4 mm air gap
  • ▸ Regulated DC output at about 17 V
  • ▸ Seven logged readings
  • ▸ Not yet independently measured
Progress so far

Where EtherTap really stands.

A frank summary, because investors, distributors and customers deserve one.

2021

First prototype built and logged

A five-coil bench unit with a 4 mm air gap was assembled, and a short series of readings was recorded.

2021 – 2026

Pause and consolidation

Development slowed. Records, concepts and commercial ideas were gathered in one place.

OCT 2026

Full records audit

We reviewed every document and measurement to separate what is demonstrated from what is hoped for.

NOW · PHASE 0

Independent validation

A closed-loop test programme with calibrated instruments and control rigs, designed so the result is believable whichever way it falls.

NEXT

Gated build-out

Funding, partnerships and customer software are released stage by stage, only as each validation gate is passed.

A note on early readings

The 2021 bench log reported output-to-input ratios of roughly 3.7–3.9x. That ratio was calculated from a simplified input reading and a fixed output voltage, so it does not demonstrate more energy out than in, and we do not present it as proof. Resolving this properly, with full power analysis and an independent party, is exactly what Phase 0 is for.

Obstacles

What stands between us and a product.

Naming the hard parts is how we plan around them.

⚖

Burden of proof

Any new converter must show, with rigorous measurement, what it delivers per unit of input. Extraordinary claims need independent confirmation.

📏

Measurement quality

True power needs voltage and current captured together over time, with calibrated meters and a closed loop that includes every energy source.

🏭

Engineering and manufacturing

Moving from a bench unit to something repeatable means thermal design, materials sourcing and quality control.

🛡

Safety & certification

Electrical safety, EMC and market approvals (such as CE) are required before any retail or wholesale sale.

📄

IP and company structure

Clear ownership of the design and a clean corporate entity are prerequisites for serious partners and investors.

💶

Funding discipline

Capital is staged against evidence, which protects backers and keeps the programme honest.

Market & potential

Where a validated converter could matter.

If validation succeeds, these are the segments we would approach first. Market sizing will be added with sourced figures once the technical case is established.

SEGMENT 1

Off-grid & remote

Cabins, farms, telecom sites and islands that pay a premium for dependable local power.

SEGMENT 2

Home resilience

Backup and supplementary power paired with solar and batteries.

SEGMENT 3

Small commercial

Shops, workshops and light industry with high energy costs or unreliable supply.

SEGMENT 4

Channel partners

Electrical wholesalers and installers who can bring certified units to market.

Roadmap

Three gates, four funding stages.

Each stage unlocks only when the previous gate has been passed on evidence.

PHASE 0 → GATE 1

Stage A · Validate

Closed-loop tests, calibrated instruments, control rigs and an independent lab review.

GATE 2

Stage B · Engineer

Repeatable prototype, safety design and documented performance envelope.

GATE 3

Stage C · Certify

Pilot units, regulatory testing and first channel partners.

AFTER GATE 3

Stage D · Scale

Manufacturing partnerships, retail and wholesale launch, customer app.

For you

What EtherTap offers each audience today.

Be first to know, with no commitment.

  • Early-access list with updates as each validation result is published
  • No pre-orders or deposits are being taken at this stage
  • Product, pricing and warranty details will be released only after certification
Join the list

Position yourself ahead of the channel.

  • Express interest in distribution or installation partnerships
  • Receive the validation report and technical datasheet when available
  • Help shape product specs, packaging and support requirements
Register interest

Staged capital against evidence.

  • Funding is released in four stages tied to three validation gates
  • Data room with test protocols, raw measurements and IP documents opens as results are produced
  • Transparent reporting, including negative results
Request investor briefing
FAQ

Straight answers.

Is this free energy?

No. EtherTap makes no claim of creating energy. We are testing the efficiency and practicality of an electromagnetic converter design, and conclusions will follow the measurements.

Can I buy a unit?

Not yet. No product is on sale and no deposits are accepted until the design has passed independent validation and the required safety certification.

How will results be shared?

Test protocols, instrument details and summary results will be published here, with raw data available to registered partners and investors.

What if validation does not go as hoped?

We will say so, and decide openly whether to redesign or stop. Staged funding exists precisely to limit risk in that case.

Is this an offer of securities?

No. Nothing on this site is an offer or solicitation to invest. Any investment discussion happens separately, under appropriate legal documentation.

Get in touch

Tell us who you are.

Whether you are a retail buyer, wholesaler, researcher or investor, leave your details and we will write back with the next update.

First submit from a new site URL opens FormSubmit’s activation page. Check andromedangroup@gmail.com (and Spam) for the Activate link, click it, then submit again — enquiries will arrive by email.